I’m currently experiencing an issue with the ‘Integrate Variables’ function in ParaView (v5.13). It seems that it’s not working as expected.
I am attempting to compute the average of specific variables over a cross-section of a pipe - this data is from a CFD simulation from Ansys CFX and exported in EnSight Gold format. However, the results I’m getting from the ‘Integrate Variables’ function seem unusual. For instance, the volume fraction, which is 1 everywhere according to the info tab, is reported as 0.046 by the ‘Integrate Variables’ function.
I can’t seem to figure out what’s going wrong. Has anyone else experienced this issue or does anyone have any suggestions on what I might be doing wrong? Thanks!
Thanks Mathieu, here’s the data for volume fraction and velocity. The goal is to calculate the average velocity for this cross-section and I’m using the volume fraction as a sanity check because it should return 1.